return
home \ maison de l'architecture et de la ville de Provence-Alpes-Côte d'Azur
maison de l'architecture Villa Romée
nul n'est prophete en son pays édition 2008

Project name

vide

station amphitria

Place

vide

83 Var

Cap Sicié

Theme

vide

Technical installations

station amphitria
vide

General contractor

vide

cabinet Duchier Bonnet Piétra

vide

station amphitria

 

designation: water treatment plant

 

The project we are showing is mainly composed of a treatment plant. Built at the foot of a cliff, it protects the Varoise coast while blending in and imitating the rock wall.

 

Total surface area of the operation: 32 000 m² floor space

The total construction cost: 87 000 000 euros tax and fees included.

 

The exact location of the project is in Cap Sicié (Var).

commune de La Seyne-sur-Mer au sud ouest de Toulon.

The specific materials used: concrete and slate.

 

We are un cabinet started in 1987

We are a team of 12 people ,

Our practice has

 

 


Sincerely,

cabinet Duchier Bonnet Piétra

821, rue Joliot Curie

BP 19 ZI Toulon Est

83087 Toulon cedex

tél. : 04 94 75 21 61

contact@archidbp.com

 

Photography credit: photographe Serge Demailly

cabinet Duchier Bonnet Piétra