designation: reconstruction of site in use
The project we are showing is mainly composed of facilities which include a junior high school with dojo, half-board facilities, workshops, library, function room and sport areas and a landscaped promenade
Total surface area of the operation: 10 500 m² floor space and 20 000 m² grounds space;
Type of layout: reconstruction.
The total construction cost: 14 000 000 euros tax and fees included.
The exact location of the project is in Beuvry (Pas-de-Calais).
Collège Albert Debeyre rue Antoine de Saint-Exupéry .
The type of location is: Doucement urbain.
This site can be visited.
The specific materials used: stainless steel, concrete (mesh) and zinc.
The main color of the project: bronze and gray.
The time elapsed from contract to completion 3 years
We are une agence started in 2008
We are a team of 11 people ,
Our practice has 5 qualified architects
The general number of people having participated, closely or from a distance, in the completion of the project:
3 architects, 2 engineers, 5 companies, 2 inspectors.
The total of interlocutors, sponsors or people representing the project management ", was alone.
This makes réduit.
The nicest remark made about this project: “We feel good here, we are always finding new viewing angles.”
Sincerely,