designation: cultural center and dining facilities
The project we are showing is mainly composed of a spacious, contemporary building dedicated to cultural activities, including dining facilities. Built in a landscaped field.
Total surface area of the operation: 1200 m² floor space and 0 m² grounds space;
The total construction cost: 2 250 000 euros tax and fees included.
The price per square meter of the construction: 1 875 euros tax and fees included.
The exact location of the project is in Lambersart (Nord).
Avenue du Colysée.
The type of location is: Doucement urbain.
This site can be visited.
The specific materials used: ipe wood, glass, concrete and steel.
The main color of the project: Natural wood.
The time elapsed from contract to completion 27 months
We are une agence started in 1970
We are a team of 22 people ,
Our practice has 10 qualified architects
The general number of people having participated, closely or from a distance, in the completion of the project:
4 architects, 4 engineers, 2 companies, 1 inspector.
The total of interlocutors, sponsors or people representing the project management ", was alone.
This makes habituel.