designation: agricultural high school
The project we are showing is mainly composed of two patio-courtyards linked together by an enclosed glass panel walkway flanking and sheltering the classrooms and laboratories.
Total surface area of the operation: 8000 m² floor space and 20000 m² grounds space;
Type of layout: new building.
The total construction cost: 6 700 000 euros tax and fees included.
The total grounds planning cost: 400 000 euros tax and fees included.
The price per square meter of the construction: 887 euros tax and fees included.
The exact location of the project is in Théza (Pyrénées-Orientales).
route Alenya.
The type of location is: rural.
This site can be visited.
The specific materials used: exterior insulation and cladding.
The main color of the project: red.
The time elapsed from contract to completion 24 months
We are une agence started in 1979
We are a team of 3 people ,
Our practice has 1 qualified architects
The general number of people having participated, closely or from a distance, in the completion of the project:
6 architects, 3 engineers, 60 companies, 3 inspectors.
The total of interlocutors, sponsors or people representing the project management made up ", make up total to 3.
This makes habituel.
The most unpleasant remark made about this project: that the passive solar energy would not work and that the contractor had asked for an active solution.
Sincerely,