designation: grade school
The project we are showing is mainly composed of a school with eight classes, a multi-purpose auditorium and a multimedia room.
Total surface area of the operation: 1000 m² floor space and 6800 m² grounds space;
Type of layout: new building.
The total construction cost: 1 855 000 euros tax and fees included.
The total grounds planning cost: 435 000 euros tax and fees included.
The price per square meter of the construction: 1 420 000 euros tax and fees included.
The exact location of the project is in Saint-Jean-du-Gard (Gard).
Les Fumades.
The type of location is: Périurbain.
This site can be visited.
The specific materials used: wood, zinc and masonry.
The main color of the project: Natural wood.
The time elapsed from contract to completion 27 months
We are une agence started in 1997
We are a team of 4 people ,
Our practice has 3 qualified architects
The general number of people having participated, closely or from a distance, in the completion of the project:
3 architects, 4 engineers, 15 companies, 2 inspectors.
The total of interlocutors, sponsors or people representing the project management made up ", make up total to 2.
This makes habituel.
The nicest remark made about this project: “Our school is beautiful.” - the children of Saint-Jean.
Sincerely,