designation: transport hub
The project we are showing is mainly composed of a transport hub for bus / tramway / automobile / bicycles.
Total surface area of the operation: 211 m² floor space and 5753 m² grounds space;
Type of layout: new building.
The total construction cost: 574 000 euros tax and fees included.
The total grounds planning cost: 230 000 euros tax and fees included.
The price per square meter of the construction: 2 592 euros tax and fees included.
The exact location of the project is in Montpellier (Hérault).
ZAC Odysséum.
The type of location is: Urbain.
This site can be visited.
The specific materials used: glass, woven metal and metal.
The main color of the project: Blue / silver.
The time elapsed from contract to completion 2 years
We are une agence started in 2008
We are a team of 8 people ,
Our practice has 4 qualified architects et 1 student
The general number of people having participated, closely or from a distance, in the completion of the project:
2 architects, 3 engineers, 1 inspector.
The total of interlocutors, sponsors or people representing the project management ", was alone.