designation: elementary school
The project we are showing is mainly composed of classrooms.
Total surface area of the operation: 1 000 m² floor space
Type of layout: building.
The total construction cost: 1 696 992 euros tax and fees included.
The exact location of the project is in Chanas (Isère).
place de France 38150 Chanas.
The type of location is: Urbain.
This site can be visited.
The specific materials used: wood and cellulose fiber.
The main color of the project: Natural wood.
The time elapsed from contract to completion 2 years
We are un atelier started in 1990
We are a team of 6 people ,
Our practice has 3 qualified architects et 1 student
The general number of people having participated, closely or from a distance, in the completion of the project:
2 architects, 4 engineers, 12 companies, 2 inspectors.
The total of interlocutors, sponsors or people representing the project management made up ", make up total to 6.
This makes habituel.
The most unpleasant remark made about this project: that the cleaner found that the multitude of colored lights stopped her from seeing if the floor was clean or dirty...
Sincerely,