designation: community center
The project we are showing is mainly composed of an 380-seat auditorium/activity room, (stage and dressing room, reception, sanitary block, stock room, storage space...)
Total surface area of the operation: 765 m² floor space and 3 400 m² grounds space;
Type of layout: new building.
The total construction cost: 1 360 000 euros tax and fees included.
The total grounds planning cost: 285 000 euros tax and fees included.
The price per square meter of the construction: 1 778 euros tax and fees included.
The exact location of the project is in Montataire (Oise).
rue Louis Blanc.
The type of location is: Périurbain.
This site can be visited.
The specific materials used: painted and galvanized sheet metal.
The main color of the project: Polychrome.
The time elapsed from contract to completion 34 months
We are un atelier started in 1995
We are a team of 4 people ,
Our practice has 3 qualified architects
The general number of people having participated, closely or from a distance, in the completion of the project:
3 architects, 4 engineers, 12 companies, 3 inspectors.
The total of interlocutors, sponsors or people representing the project management made up ", make up total to 2.
This makes très grand.
The nicest remark made about this project: : Before people said “the construction site next to the Pathé” now they say “the multiplex next to the meeting place.”
Sincerely,