designation: general and technological high school
The project we are showing is mainly composed of a high school set down in the heart of a site on a large meadow, nestled into groves of oaks.
Total surface area of the operation: 9 600 m² floor space
Type of layout: building.
The total construction cost: 14 000 000 euros tax and fees included.
The price per square meter of the construction: 1 450 euros tax and fees included.
The exact location of the project is in Bruz (Ille-et-Vilaine).
esplanade Lycée 35170 Bruz.
The type of location is: Périurbain.
The time elapsed from contract to completion 7 years
The general number of people having participated, closely or from a distance, in the completion of the project:
2 architects, 4 engineers, 15 companies.
Sincerely,