designation: grade school
The project we are showing is mainly composed of 5 classes, a library, and studios
Total surface area of the operation: 1 070 m² floor space and 20 000 m² grounds space;
Type of layout: new building.
The total construction cost: 1 250 000 euros tax and fees included.
The price per square meter of the construction: 1 170 euros tax and fees included.
The exact location of the project is in Mandeure (Doubs).
rue de la Fontaine 25350.
The type of location is: Doucement urbain.
This site can be visited.
The specific materials used: metal, wood and glass.
The main color of the project: white.
The time elapsed from contract to completion 2 years
We are un atelier started in 1981
We are a team of 3 people ,
Our practice has 1 qualified architects
The general number of people having participated, closely or from a distance, in the completion of the project:
1 architect, 3 engineers, 13 companies, 1 inspector.
The total of interlocutors, sponsors or people representing the project management made up ", make up total to 2.
This makes réduit.
The nicest remark made about this project: environmental focus, orientation, dominant winds and other factors that had to be taken into account. The building received the HQE® label.