designation: type C gymnasium
The project we are showing is mainly composed of a sports complex in the grounds of a junior high school.
Total surface area of the operation: 2010 m² floor space and 0 m² grounds space;
Type of layout: renovation/building.
The total construction cost: 2 248 181 euros tax and fees included.
The price per square meter of the construction: 1 118 euros tax and fees included.
The exact location of the project is in Ancy-le-Franc (Yonne).
Collège - la Chenevrière des Arbres.
The type of location is: Doucement urbain.
This site can be visited.
The specific materials used: wood and steel sheeting.
The main color of the project: natural.
The time elapsed from contract to completion 4 years
We are un cabinet started in 1977
We are a team of 5 people ,
Our practice has 2 qualified architects
The general number of people having participated, closely or from a distance, in the completion of the project:
1 architect, 2 engineers, 8 companies, 1 inspector.
The total of interlocutors, sponsors or people representing the project management ", was alone.
This makes habituel.
The nicest remark made about this project: “The project is so well integrated into its environment that it becomes almost invisible in the middle of the trees.”
Sincerely,